IBM.000-331
Power Systems Sales for AIX and Linux
1: Service-Oriented Architecture (SOA) implementations using solutions based on System p and WebSphere can deliver superior value by using the three pillars of the IBM Systems agenda. Which of the following combinations properly describes this Systems Agenda?
A.Hardware, Software, and Services
B.Performance, Reliability, and Value
C.Virtualization, Openness, and Collaboration
D.Technology, Price/Performance, and Innovation
Answer: C
2: A travel industry customer has experienced tremendous seasonal transaction spikes. Their POWER5 550Q server has reached capacity. They are considering a POWER6 replacement and are concerned with scalability. Which of the following solutions meets this need at lowest cost?
A.550 8 core active plus 4 CUoD
B.520 4 core active plus 4 CUoD
C.570 8 core active plus 4 CUoD
D.595 4 core active plus 8 CUoD
Answer: C
3: A prospect is confused about SWMA. Which of the following describes the standard terms for SWMA for AIX and PowerVM?
A.1 or 3 year options
B.Optional 1, 3, or 5 year plans
C.Annual fees as long as in force
D.One year no charge and annual fees after that
Answer: A
4: A customer with several older pSeries servers plans to consolidate to a single Power Systems server. Which of the following tools can provide output that can be merged with Work Load Estimator to size the upgrade based on utilization and growth trends?
A.Insight Manager
B.System Planning Tool
C.Tivoli Capacity Planner
D.Electronic Service Agent
Answer: B
5: A Power Systems sales representative has a meeting with the CIO of a telecommunications company. They have twenty POWER4 systems now. They have ample budget for the new POWER6 systems. They want to move very quickly into virtualization and are anxious to order additional servers. The customer must be in production within 90 days. Which of the following is the key challenge for this opportunity?
A.Adequate funding
B.Business problem
C.Project management
D.Software requirements
Answer: C
6: A company going through business recovery is refreshing non-IBM servers. What is the most complete selling point to replace the existing servers with the new generation of Power Systems servers?
A.Virtualization features
B.Industry leading performance
C.Improved total cost of ownership
D.Ability to run multiple operating systems
Answer: C
7: An SMB customer has been running many small applications on separate older POWER5 servers. They have been reluctant but have agreed to try Virtualization with two applications as a test. Which PowerVM offering meets this need?
A.Lx86
B.Express Edition
C.Standard Edition
D.AIX 6 Workload Manager
Answer: B
8: A POWER6 server customer plans to implement 2 micro partitions (one Linux, one AIX) to be managed by an existing HMC on a 520 server. Which of the following is the minimum version of PowerVM Editions to meet this need?
A.Entry
B.Express
C.Standard
D.Enterprise
Answer: C
9: A healthcare claims office is consolidating 16 older POWER5 servers into Power Systems LPARs. The sizing team determined each LPAR requires one POWER6 CPU 4.7Ghz, 2GB of memory, and two PCIe adapters. Which of the following systems meets this need?
A.One p570
B.Two p550s
C.Six JS22s in a BladeCenter S
D.Six JS12s in a BladeCenter H
Answer: A
10: A customer has three JS22 Express Blades. They plan to try virtualization but are concerned about the cost. Which of the following describes the cost?
A.PowerVM Enterprise Edition allows a 90 day trial free of charge.
B.They require a minimum SWMA contract for PowerVM Standard Edition.
C.They can implement PowerVM for a monthly per core charge plus SWMA.
D.PowerVM Express Edition is a no charge feature and allows up to three logical partitions.
Answer: B